FM 3349 at US 79
Location FM 3349 at US 79 
Description   The project includes widening the existing undivided two-lane FM 3349 and CR 101 roadways into a four-lane divided roadway, constructing an elevated crossing over US 79 and the Union Pacific Railroad and constructing a local access road "jug handle" to provide connectivity between US 79 and FM 3349/CR 101. 
Status A final environmental assessment (EA) is available for public review, and TxDOT has issued a finding of no significant impact (FONSI) for the proposed FM 3349 at US 79 project, from County Road 404 to County Road 395 in Williamson County, Texas. Both are on file and available for inspection Monday through Friday between the hours of 8 a.m. and 5 p.m. at the Williamson County Road and Bridge office at 3151 S. E. Inner Loop, Suite B, Georgetown, Texas 78626. You may also review the FONSI and final EA at the links below.

The design engineer is HDR. The project received funding from the voter-approved 2019 Road Bond. Construction is expected to begin in fall 2022 on the interim project with completion in summer 2025. The ultimate project may be built in phases over several decades, as the county grows and as funding becomes available. For more information on the Southeast Loop, please visit our webpage.

Contact Email roads@wilco.org or phone 512-943-1195
 
Documents

*Please note, the project will be built in phases. The first phase of this project is shown in the interim schematic above. As the County grows and as funding becomes available, the ultimate interchange would be built. This would be built in phases over several decades.

 
Project Map