en-USes-MX
Southeast Loop

Location: East/west travel between SH 130 and FM 3349 and north/south travel to US 79 in Precinct 4

OverviewWilliamson County conducted a study to consider connections for east/west travel between SH 130 and FM 3349 and north/south travel to US 79. The schematic was completed in spring 2020 and right of way acquisition is underway. Funding for construction was secured through the voter-approved 2019 Road Bond for the first frontage road of two segments of the Southeast Loop: SH 130 to CR 137 and CR 404 to US 79. Construction is expected to begin in spring 2021. For information on the third segment, FM 3349 at SH 79, click here.

 
Materials and Documents

*Please note, these are the ultimate roadway schematics. The first phase of this project is a two to three lane road: one lane in each direction and potentially a center turn lane, as shown on the Interim Schematics. Construction on the first phase of the frontage road is expected to begin late spring 2021 between SH 130 and CR 137. Future phases of construction will include the first phase, Interim Schematic, from CR 137 to the east. As traffic requires, a second frontage road, which will create divided lanes for each direction, and main lanes will be added if the County continues to grow and the need arises.

 
Public Involvement

Williamson County wants to hear from you, and public input is encouraged. 

An open house was held on June 24, 2019. Comments from the open house were accepted through July 9, 2019. Materials from the meeting are available below. 

For more information or to submit comments, please reach out:

Email: roads@wilco.org
Call: 737-808-4694
Mail: Public Information Office, 710 S. Main Street, Suite 101, Georgetown, TX 78626
Updates: If you would like to receive e-mail updates, please send an email to roads@wilco.org with "Southeast Loop Updates" in the subject line.