FM 3349 at US 79
Location FM 3349 at US 79
Description The project will construct dual bridges on FM 3349 over US 79 and Union Pacific Railroad.
Status The FM 3349 at US 79 interchange intends to provide a safe grade-separated railroad crossing and was part of the Southeast Loop project. The design engineer is HDR. The project received funding from the voter-approved 2019 Road Bond. We are seeking federal and state funds to leverage with our local funds to the greatest extent possible. Construction is expected to begin within the next two years on the interim project. As the County grows and as funding becomes available, the ultimate interchange would be built. This would be built in phases over several decades. View a project fact sheet sheet here. For more information on the Southeast Loop, please visit our webpage
 
Contact Email roads@wilco.org or phone 512-943-1195
 
Documents

*Please note, the project will be built in phases. The first phase of this project is shown in the interim schematic above. As the County grows and as funding becomes available, the ultimate interchange would be built. This would be built in phases over several decades.

 
Project Map
FM 3349 at US 79 Project Map