CR 245
Location North of RM 2338 to Ronald Reagan Boulevard
Description   The CR 245 project consists of the reconstruction of the existing two-lane CR 245 to an interim three-lane roadway, with a center turn lane and right turn lanes at specific locations. The three-lane interim roadway will be part of the future ultimate six-lane roadway. The CR 245 project was funded through the voter-approved 2019 Road Bond and is meant to improve mobility around Georgetown and Sun City. The engineering firm for the project is Bridgefarmer & Associates, Inc.
Status Design of the project began in the summer of 2020. Construction is expected to begin in spring 2022 and is anticipated to be completed in spring 2023.
Contact Email roads@wilco.org or phone 512-943-1195.
 