Ronald Reagan Widening
Location Ronald Reagan Boulevard from FM 3405 to SH 29
Description This project includes making the existing road northbound only and building separate two lanes to act as a second frontage road, which will be southbound only. Both roads will include turn lanes at intersections and shoulders.
Status

The engineer, CP&Y, is working on designing the roadway. They anticipate it will be finalized by summer 2022. For information on other segments of the Ronald Reagan Corridor Planning project, please click here. 

Lane Closure: Williamson County’s contractor Joe Bland will be restriping Ronald Reagan Blvd. at Elizabeth Parkway. This will take place on Tuesday, Dec. 20 and Wednesday, Dec. 21 between the hours 8 a.m. to 5 p.m. This will be a rolling operation with peace officers present to help with traffic control. Work will only take place if weather permits and minimal delays are expected. 

Temporary Traffic Signal: A temporary signal has been installed at Ronald Reagan Blvd. and Santa Rita Blvd. A permanent light will be installed once the widening project takes place. 

Contact Email roads@wilco.org or phone 512-260-4280.
 