CR 258 Extension (US 183 to Sunset Ridge Drive)
Location CR 258 Extension (US 183 to Sunset Ridge Drive)
Description    The project will construct a new two-lane roadway facility from US 183 to Sunset Ridge Drive and will include a connection to Questa Trail. The Texas Department of Transportation is planning a concurrent project that will add turn lanes along US 183 onto CR 258.
Status The contractor is Joe Bland Construction. Construction began in October 2022 and is anticipated to be complete in early 2024. 
Contact Email roads@wilco.org or phone 512-943-1195.
 
Documents
 TitleModified DateSize 
CR 258 Fact Sheet3/27/2023320.98 KBDownload
CR 258 FAQs,3/27/2023219.94 KBDownload
 
Project Map