Hairy Man Road / Brushy Creek Road Safety Improvements
Location Hairy Man Road/Brushy Creek Road from Brushy Bend Drive to Sam Bass Road.   
   
Description   This project is 2.2 miles in length and includes safety improvements between Brushy Bend Drive and Sam Bass Road. Improvements will include the addition of shoulders along the roadway, addition of rumble striping along the shoulders, and addition of turn lanes into the adjacent parks.
   
Status

Design is complete by Atkins. Floodplain impact study is complete. Environmental due diligence is complete. Survey and geotechnical investigation work is complete. A presentation on the project was given at the BCMUD Town Hall on April 4, 2019. Meetings with affected property owners were held in November 2018. The original project design was completed in summer 2019; however, with the design changes prompted by additional community input and engineer analysis, the design is being updated. Construction is expected to begin later this summer with an anticipated completion date of mid-to-late 2021.

Email roads@wilco.org or phone 512-943-1195.

For more information on the The Great Oaks Drive bridge replacement project, go to the project page. 

 
Project Map
Hairy Man Road Safety Improvements
 